MAINTENANCE TYPE B (perform every three months)

Note

The 3 month maintenance actions, listed below, may be performed by a trained projectionist who is familiar with potential hazards associated with the product.

No.

Maintenance action

Remarks

1

Clean the housing of the projector.

Removal overall dust accumulation on projector covers. See cleaning instructions in this manual.

2

Clean the housing of the chillers.

Removal overall dust accumulation on chiller covers. See documentation set of the chillers.

3

Verify the internal clock of the ICMP with real time clock. Correct if needed.

ICMP version 1.2.1 is required.

Communicator version 5.0 is required.

See user guide of Communicator for detailed instructions.