|
The 3 monthly maintenance actions, listed below, may be performed by a trained projectionist who is familiar with potential hazards associated with the product. |
|
No. |
Maintenance action |
Remarks |
|---|---|---|
|
1 |
Clean the air vents/inlets of the projector:
|
Use a vacuum cleaner. |
|
2 |
Clean the cabinet of the projector. (Removal overall dust accumulation on projector covers) |
See cleaning procedure "Cleaning the exterior of the projector". |
|
3 |
Check cooling liquid level at cooling reservoir |
Start refill procedure when level is below Min or almost at Min.See "Cooling liquid refill". If the liquid level is too low, the maintenance/repair should be performed by a service technician. |
|
4 |
Verify the internal clock of the ICMP with a real time clock. Correct if needed. |
See user guide of Communicator for detailed instructions. |